MERIMBULA – LEACHATE ORGANICS DAM Desilting Solutions was engaged by Bega Valley Shire Council to remove approximately 500m³ of sediment from the leachate organics dam... Read More +
CONNOLLY DAM – DESILTING OF INTAKE TOWER Desilting Solutions was engaged by Southern Downs Regional Council to remove approximately 1,000 m³ of silt from around the intake... Read More +
DUNEDOO – MATURATION POND DESLUDGING AND BENEFICIAL REUSE OF BIOSOLIDS Desilting Solutions was engaged by Warrumbungle Shire Council to remove and beneficially reuse approximately 2200m³ of biosolids from the maturation... Read More +
Brisbane River Milton Desilting Solutions were engaged by Brisbane City Council to remove silt from the Castlemaine St Pipeline in Milton, Brisbane. The... Read More +
ARRAW DAM – SILT REMOVAL Desilting Solutions was engaged by Rio Tinto to desilt the tailwater pond at Arrow Dam, the bauxite plants main water... Read More +
FOREST LAKE – LAKE ENTRANCE Desilting Solutions was engaged by Brisbane City Council to undertake targeted dredging works at the three inlet areas to Forest... Read More +
CABOOLTURE WWTP – BALANCE TANK Desilting Solutions was engaged by Unity Water to desludge a balance tank at their Caboolture Wastewater Treatment Plant. The Desilting... Read More +
PORT OF TOWNSVILLE – DREDGING Desilting Solutions was engaged by Port of Townsville to undertake targeted dredging works adjacent to berthing pockets within the port.... Read More +
PORT OF TOWNSVILLE – CULVERT Desilting Solutions was engaged by Port of Townsville to undertake dredging works inside a 1600mm wide culvert which drained a... Read More +
Keith Boden Wetlands Desilting Solutions was engaged by Brisbane City Council to remove approximately 700m3 of sediment from the sediment basin in the... Read More +
Toowong Desilting Solutions were engaged by Brisbane City Council to desilt approximately 200m of the 3000mm diameter Land St stormwater pipe... Read More +